Crew results

Crews compete on work QC has accepted.

Points are labour hours by the norm for work accepted by QC. Crews see the ranking; each person sees only their own contribution. The site manager corrects with a name and a reason, and Marta tells each crew its result on Monday.

Crew results: weekly ranking by % of norm from work accepted by QC, with waiting for QC, rework and downtime

Product screenshots · sample data from a demo project

What it does

  • 01

    Only accepted work scores

    Unaccepted work earns no points; rework counts on the day of the fix, up to the points of the rejected work. If the EPC rejects work QC had accepted, the crew keeps its points and the rejection counts against the inspector.

  • 02

    Fair targets

    The target is the crew’s hours in tasks with a norm, minus downtime that wasn’t its fault. Crews without a target are shown as “not rated” instead of last.

  • 03

    Crews ranked, personal numbers private

    The crew ranking is public on site. A person’s own numbers are visible only to them, the site manager and the office. The app has no bonuses, money, streaks or levels. Your organisation decides whether to switch on the worker view.

  • 04

    Corrections with an author

    Present or absent, late through the company’s fault, sick leave: the site manager corrects these with a name and a time, and can reverse the correction.

  • 05

    Marta’s Monday sentence

    On Monday morning Marta sends each crew one sentence about last week’s result. The system inserts the numbers in that sentence.

  • 06

    “Well done!” at the last table

    A full-screen celebration when the crew reports the last table of a task, and a crew goal for the day on the home screen: reported versus planned.